Fanco Habitat Expert Heat Recovery

$949.00

This Fanco Habitat offers a shorter ‘core’ – meaning the unit can be installed in most Australian households with walls from 220mm – 300mm thickness. If your wall is less than 220mm – we also offer an outer hood which means the unit could be installed on a wall as thin as 100mm. This practical new addition increases the wall thickness tolerances, making the product suitable for virtually any standard wall thickness from 100mm up to 300mm. The unit comes with White Hood included in the box, whereas the a Thin Wall Stainless Steel Hood is available as an accessory. Continue reading to learn more about the product – if you have any questions feel free to reach out to one of our experts. You can also refer to Fanco Habitat Expert spec sheet.

ENQUIRE NOW

Secure
Checkout

4.9 Google
Shop Rating

Fast + Free
Shipping*